Testing and Commissioning
- Gas Insulated Switchgears (GIS) up to 765kV.
- Switchyard up to 765kV.
- Parameterization, Configuration, Testing and Commissioning of Static & Numerical Protection relays.
- Electromechanical relays.
- Distribution & Power Transformers.
- LV, MV and HV Switchgears.
- LV, MV and HV Motors, VFD’s
- Generators.
- Line Differential Stability, Busbar Differential Stability, Transformer Differential & REF Stability, Overall Stability, Motor & Generator Stability
- Battery & Battery charger
- Tan delta & Power factor measurement for CT, CVT, PT, Transformers, Surge arrestors, etc….
- Dynamic Contact Resistance measurement for EHV Breakers
- Short Circuit impedance measurement for Transformers, Reactors, Generators
- Leakage current measurement for EHV surge arrestors
- Dynamic Resistance & Sweep Frequency Response Analysis (SFRA) for Transformers
- Thermal Imaging analysis for Joints & Connections