Testing and Commissioning

  • Gas Insulated Switchgears (GIS) up to 765kV.
  • Switchyard up to 765kV.
  • Parameterization, Configuration, Testing and Commissioning of Static & Numerical Protection relays.
  • Electromechanical relays.
  • Distribution & Power Transformers.
  • LV, MV and HV Switchgears.
  • LV, MV and HV Motors, VFD’s
  • Generators.
  • Line Differential Stability, Busbar Differential Stability, Transformer Differential & REF Stability, Overall Stability, Motor & Generator Stability
  • Battery & Battery charger
  • Tan delta & Power factor measurement for CT, CVT, PT, Transformers, Surge arrestors, etc….
  • Dynamic Contact Resistance measurement for EHV Breakers
  • Short Circuit impedance measurement for Transformers, Reactors, Generators
  • Leakage current measurement for EHV surge arrestors
  • Dynamic Resistance & Sweep Frequency Response Analysis (SFRA) for Transformers
  • Thermal Imaging analysis for Joints & Connections